Surat Metro
Surat Metro is an under-construction rapid transit system in Surat, Gujarat, comprising two corridors (Red Line and Green Line) totaling 40.35 km with 37-38 stations. Construction began 18 January 2021; as of the research date (July 2026) the system has not opened to the public, though trial runs began in March/April 2026 on an 8.5 km viaduct stretch between Dream City and Althan Tenement. GMRC had targeted a partial public opening around June 2026, but no confirmed inauguration had occurred as of this research, with full Phase 1 completion still projected for December 2027.
- Lines
- 2
- Stations
- 37
- Network
- 40 km
- Opened
- -
Lines
Popular stations
Popular routes
Route pages for Surat Metro are being released in batches - try the route planner for any station pair right now. Route Planner
Network Map
View full interactive map →Green Line
Red Line
Frequently asked questions
How many lines and stations does Surat Metro have?
Surat Metro currently operates 2 lines serving 37 stations. The network spans about 40 km.
How many interchange stations does Surat Metro have?
Surat Metro has 1 interchange stations where you can switch between lines.